Division 01 · Process & pipeline engineering

Cleaning, flushing, hydrotesting, chemical cleaning, filtration and disinfection — so a pipeline is ready before it is placed into service.

01 / 08 · Process & Pipeline
  1. 01

    Cleaning & flushing

    Removal of construction debris, loose scale, sediment, welding residue, oil and grease traces and particulate contamination.

    • System flushing & pipeline cleaning
    • Chilled water pipeline flushing
    • Temporary bypass & circulation arrangements
  2. 02

    Hydrotesting & pressure testing

    Pressure testing of pipelines and systems to confirm integrity before operation, with chart-recorded results.

  3. 03

    Chemical cleaning

    Removal of deposits, oils, oxides, scale and process contaminants using selected chemistry, followed by neutralization.

  4. 04

    Process piping works

    Process plant piping, steel and alloy piping and HDPE works, with hot and cold insulation support.

    • Process plant piping
    • Steel & alloy piping
    • HDPE works
    • Hot & cold insulation
  5. 05

    Filtration, disinfection & records

    Staged filtration to remove suspended solids, chemical disinfection of utility systems, and reports, checklists, pressure records and handover documents.

Related projects

Where we have delivered this.

All projects →
Start a conversation

Let’s make your system commissioning-ready.

Tell us the system type, pipe sizes or volume, location and scope. Our engineers will propose the method and equipment package.

Part of

Island Tower
Group of Companies